Position: Home > Solutions > Construction Waste Crushing Line
Construction Waste Crushing Line

Construction Waste Crushing Line

    Feeding Size: 50-850mm

    The Discharging Size: 0-32mm

    Processing Capacity: 20-850t/h

    Applied Material: construction waste

    Details Overview: Construction waste line generally consist the crushing line, dry mortar production line, sand making line, brick production line, the mixture of inorganic line.

Email: sales@shibochina.com

Construction waste recycling background:

City building increasing pace, construction waste is increasing, and its amount is going up year by year. Construction amount have reached up to larger parts of the city’s total waste. It put in the open air or land filled outside without any special treatment. It not only consumes a lot of land resources and also pollution the environment. What's worse, there is almost no room to be buried or piled up today, and "garbage” has become a common phenomenon. Therefore, in order to devote to the sustainable development of society, it is necessary to solve the problem of the construction waste recycling.

Construction Waste Crushing Line

Construction Waste Crushing Line

Source of construction waste:

A: The excavation of the road: It depend to concrete road excavation, Asphalt road excavation, and

B: Old construction building demolition: It depends to brick, stone, concrete, plastic, stick, steel, gypsum, mortar, and other.

C: New construction building working place: The remainder parts of concrete, gypsum etc.

Now the B is main construction waste source.

Typical uses of the construction waste after crushing:

0-2.5mm Recycled material: used as main raw material for the mortar wipled wall, or replace the river sand.

0-4.5mm Recycled material: used as main raw material of brickplaying mortar.

2.5/4.5 - 10mm Recycled material: used as main raw material for brick making.

10 - 32mm Recycled material: used as raw material for road construction.

larger than 32mm Recycled material: re-enter into the crusher, or used for rock embankment.

Construction waste crushing process

The construction waste crushing plant equipment and flow chart.

A: Economical type: Vibrating feeder + PC hammer crusher ( Pxj fine crusher) + Screen.

B: Commonly type: Vibrating feeder + PE jaw crusher+ Iron separator + Impact crusher+ vibrating screen.

Capacity is 30-1000tph., the following is B flow chart.
 

Advantages of Production Line

Strict quality control system and decades of years production technology make stone crusher plant better performance, higher crushing efficiency and longer service life.

Quick Way to Get Price

Please tell us your needs such as the capaicty, materials, input and output size, we send the latest price list and quotation to you.

We will reply to you within 24 hours
Complete and full after-sales service for you

Contact Us

Email

sales@shibochina.com

Whatsapp

+86 15000608351

Chat online to get price list now

Copyright © 2012-2020 Zhengzhou Shibo Machinery Manufacturing Co., Ltd. All Rights Reserved.